Complete certified doorsetsFree measure surveyEngland, Wales, Scotland & NI
Call 0800 088 6248
Fire Rated Doors
SurveyLike-for-likeHandover pack

Fire Door Replacement in March

We supply and fit fire door replacement in March (PE15) as complete certified doorsets — with a free measure survey, a fixed itemised quote listing every certificate reference, and installation exactly as tested.

From £750 per doorset in March, supplied & fitted, ex VAT

Tradesperson lifting a new white fire door leaf into a frame in a corridor

Certified fire door replacement for March

We cover March and nearby Wisbech for fire door replacement, with surveys booked around your building's access and occupancy. Each door is quoted individually, so you can see what every opening costs and why.

March is about 14 miles from Peterborough; we cover both, along with Wisbech, Ely and Peterborough.

Regulations for fire door replacement in Cambridgeshire

In March, as across England, Approved Document B governs new work and the Fire Safety Order 2005 governs existing premises. Note that Approved Document B is removing the BS 476 fire-resistance test references on 2 September 2029, so specifications are moving to EN classifications such as E30 Sa.

Cost of fire door replacement in Cambridgeshire

Our guide for fire door replacement is £750–£1,150 per doorset fitted, ex VAT. Quotes for March are fixed once we've measured, and include removing and disposing of old doors where they're being replaced.

If your fire risk assessment lists specific doors, send it with your enquiry and we'll price exactly those openings.

Where fire door replacement are needed

In March, fire door replacement are typically needed in regulation 10 remedial work and doors failed at inspection.

Cambridgeshire combines Cambridge's labs, colleges and student housing with Peterborough's growing residential and logistics sectors.

  • Regulation 10 remedial work
  • Doors failed at inspection
  • Refurbishment programmes
  • Doors with no evidence of rating

What's in the doorset

Starts fromYour fire risk assessment, inspection report or our survey
ScopeRemove old door and frame, fit new certified doorset, make good
DisposalOld doors removed and disposed of
ProgrammePhased around occupied buildings
HandoverCertificate references, installation record and photos
Elevation drawing of fire door replacement

See the full specification and options for Fire Door Replacement

What happens next

  1. Share your FRA or inspection findings
  2. We confirm every door on site
  3. Fixed quote, certified doorsets only
  4. Fitted to the manufacturer's instructions, with photos

Common questions in Cambridgeshire

Is the survey in March free?

Yes. We measure and schedule your doors at no cost and send a fixed, itemised quote.

What does a March quote include?

Survey, certified doorset, ironmongery, installation, removal of old doors and a handover pack. VAT is added at the standard rate.

Can you work around tenants or staff in March?

Yes. We phase work in occupied buildings and keep escape routes available. Each door is planned to be removed and replaced the same day; if that isn't possible, the opening is made secure and we tell you in advance.

How long does replacement take?

A single doorset usually takes a few hours to fit once manufactured. We'll give you the full programme on your quote.

Nearby towns we cover

Other fire doors in March

Get a fixed quote for your fire doors

Free measure survey. Certificate reference against every doorset.